Acceptance of sewage sludge

For the delivery and dumping of the sewage sludge, it is planned, as is already the case with the existing delivery area of the waste incineration plant, to avoid odour formation on the MVK site by means of negative pressure in the delivery hall.The delivery takes place on the side of the company building towards the railway line (in the drawing the blue building). The extracted air from the delivery hall is fed into the boiler for the combustion process. Another plus for the environment will be that the water contained in the sewage sludge can be treated and used in the existing incineration plant.In this way, the fresh water required today can be saved in the future.